NASA’s procurement combined an existing spacecraft contractor with an adapted military rocket. The agency awarded the two-seat Gemini spacecraft contract to McDonnell, which had built Mercury, and ordered modifications to the Air Force’s Titan II missile, built by Martin Marietta. That choice brought two established designs into the same flight system. [S1]
Before launch, engineers tested how the rocket stages worked in sequence: a January 21, 1964 compatibility test involved sequential 30-second static firings. The uncrewed spacecraft carried instrument pallets in place of its two ejection seats to record mission conditions, NASA says. [S1]
Gemini 1 reached orbit after five minutes and 37 seconds of powered flight, still attached to the rocket’s second stage. NASA says a higher-than-expected velocity put the spacecraft 21 miles above the intended orbit, an anomaly it did not consider serious. [S1]
Source documents
- 60 Years Ago: Gemini 1 Flies a Successful Uncrewed Test Flighthttps://www.nasa.gov/history/60-years-ago-gemini-1-flies-a-successful-uncrewed-test-flight/
